Opening a new business is exciting. But between signing a lease, coordinating contractors, hiring staff, and preparing for opening day, signage can easily become an afterthought. Unfortunately, waiting too long to think about your signs can delay your opening or leave your business without the visibility it needs from day one.
Whether you’re opening a neighborhood coffee shop in Ballard, a medical office in Bellevue, a retail storefront in Capitol Hill, or an office in South Lake Union, planning your signage early can save time, money, and frustration.
Here’s a practical checklist to help you stay on track.
1. Review Your Lease Before Designing Your Sign
One of the biggest surprises for new business owners is discovering they can’t install just any sign they want.
Many commercial properties have tenant design standards that specify:
- Sign size
- Colors and materials
- Illumination requirements
- Placement on the building
- Mounting methods
- Hours illuminated signs can operate
Some landlords even require approval of the design before you can begin permitting.
Checking these requirements first helps avoid redesigns later in the process.

2. Determine What Type of Sign You Actually Need
Not every business needs the same signage package.
Depending on your location and goals, you may benefit from a combination of:
- Illuminated channel letters for storefront visibility
- Monument signs for business parks or larger properties
- Window graphics for branding and promotions
- Directional signs for customers and deliveries
- ADA-compliant interior signage
- Lobby signs to create a professional first impression
Think about how customers will approach your business. From the street, parking lot, or inside the building? This can help determine which signs will provide the greatest value.
3. Understand Seattle’s Sign Permit Requirements
Most permanent exterior signs require permits before installation.
Permit requirements can vary depending on:
- Building type
- Sign dimensions
- Illumination
- Historic districts
- Zoning regulations
- Existing sign allowances
Waiting until the last minute to start the permitting process can push your installation back by weeks. Building permit review times can also fluctuate depending on project volume, so it’s worth factoring permitting into your overall opening timeline.
4. Think Beyond Your Storefront
Your main building sign is only one piece of your customer experience.
Ask yourself:
- Will customers know where to park?
- Is the entrance easy to identify?
- Can delivery drivers find the correct door?
- Does your suite number stand out?
- Will visitors know where to check in?
Wayfinding signs, window graphics, and entrance identification often make a bigger difference to the customer experience than business owners expect.
5. Plan for Electrical Requirements Early
If you’re installing illuminated signage, electrical planning shouldn’t wait until fabrication begins.
Depending on your building, your project may require:
- New electrical circuits
- Disconnect switches
- Conduit routing
- Coordination with electricians or general contractors
Discussing these requirements early helps prevent delays during installation.

6. Don’t Forget About Branding
Your signage is often the first physical interaction someone has with your business.
A sign should do more than display your logo. It should communicate your brand clearly and consistently.
Before production begins, make sure you have:
- High-resolution logo files
- Brand color specifications
- Approved fonts
- Brand guidelines (if available)
Consistent branding across your exterior sign, window graphics, interior signage, and printed materials creates a more professional and memorable customer experience.
7. Build Signage Into Your Opening Timeline
Many business owners assume signage is one of the last tasks before opening.
In reality, it’s often one of the first projects that should begin.
A typical commercial signage project may include:
- Initial consultation
- Site survey
- Design revisions
- Engineering (if required)
- Permit approval
- Fabrication
- Installation
Starting these steps early gives you more flexibility if revisions or permit reviews take longer than expected.
8. Consider Future Growth
If you expect your business to expand, relocate departments, or add services in the future, it’s worth planning for signage that can grow with you.
For example:
- Directory signs with changeable panels
- Digital message centers
- Modular monument signs
- Replaceable tenant panels
Thinking ahead can reduce future costs and make updates much easier.
Your Signage Checklist
Before opening your doors, make sure you’ve checked off these essentials:
✔ Reviewed your lease and landlord sign criteria
✔ Identified the types of signs your business needs
✔ Planned for permitting and approvals
✔ Considered customer wayfinding and accessibility
✔ Coordinated electrical requirements for illuminated signage
✔ Gathered your branding assets
✔ Built signage into your project timeline
✔ Planned for future business growth

Set Your Business Up for a Strong First Impression
A well-designed sign does more than mark your location. It helps customers find you, reinforces your brand, and contributes to a positive first impression before someone ever walks through the door.
By planning your signage early and understanding the steps involved, you can avoid unnecessary delays and keep your opening on schedule.
Whether you’re opening your first location or expanding into a new space, taking the time to develop a thoughtful signage plan is an investment in your business’s long-term visibility and success.


